Concept
CLOCK_PressureActivationStop_YYYYMMDDHHMMSS
URI | http://vocab.nerc.ac.uk/collection/R14/current/T200083/ | |
---|---|---|
Within Vocab | Argo technical parameter names | |
Alternative Labels | 83.2 | |
Definition | Pressure activation scrutation end date. The pressure activation phase starts after the first successfull auto-test and ends (with the start of the float mission) at the end of the CONFIG_PressureActivationTimeout_seconds period. During this phase the float checks the external pressure and can start its mission as soon as a CONFIG_PressureActivation_dbar pressure is measured. | |
Date | 2023-04-28T13:36:35 | |
Identifier | SDN:R14::T200083 | |
Note | accepted | |
Has Current Version | 1 | |
version | 1 |
Alternate Formats
Other formats for this page:
RDF/XML Turtle JSON-LDAlternate Profiles
Other views of this page:
Alternate Profiles ?Different Media Types (HTML, text, RDF, JSON etc.) and different information model views, profiles, are available for this resource.
NVS html view ? Default NVS html view.